The movement within the yard and the loading/unloading of packs of slabs is done in only one loading cyclus, avoiding multiple movements and thus allowing a saving of means and personnel.
Once loaded and fixed the slabs, the support is lifted by the crane using the appropriate crossbar. The transport is done by an overhead crane.